× Close Get a Quote

Share

The Complete Countertop Fabrication and Installation Process: What to Expect

A complete countertop project follows six connected phases: initial consultation defining material, edge profile, and budget with line-item estimates; on-site templating capturing exact measurements with laser systems or physical templates; shop fabrication including slab layout optimization, CNC cutting, edge profiling, and quality inspection over 7-12 business days; installation day site preparation with cabinet leveling and old countertop removal; setting, seaming, and sink installation with color-matched epoxy and vacuum clamps; and final sealing, cleanup, and walkthrough with care instructions and sign-off documentation.

Understanding this process helps you prepare properly, set realistic expectations, and participate effectively in decisions that affect your finished countertops. From first measurement to final signature, each phase builds on the previous one—meaning early choices and preparation directly impact final results.

Professional countertop installation in Denver follows this proven sequence, ensuring precision fit and lasting performance through systematic quality controls at every stage.

Phase 1: Planning, Selection, and Estimate

This foundational phase defines the look, function, and budget before anyone cuts stone. Decisions made here guide everything that follows.

Consultation and Design

During initial consultation, you make key selections:

Material choice:

  • Granite, quartz, marble, quartzite, or other options
  • Specific slab selection from inventory or special order
  • Color family and pattern preferences

Design specifications:

  • Slab thickness (2cm or 3cm)
  • Edge profile (eased, bullnose, ogee, mitered, etc.)
  • Backsplash style and height
  • Sink type (undermount, drop-in, farmhouse)
  • Cooktop and appliance cutout requirements

Layout discussion:

  • Seam placement strategy for best appearance
  • Overhang dimensions at islands and peninsulas
  • Support requirements for longer spans
  • Special features (waterfall edges, drain grooves)

The fabricator reviews your layout, discusses potential challenges, and identifies anything adding cost or complexity before you commit.

Initial Measuring and Estimate

Rough measurements or architectural plans generate a line-item estimate covering:

  • Material cost (per square foot)
  • Fabrication charges
  • Installation labor
  • Sink and faucet cutouts
  • Edge profile pricing
  • Old countertop removal (if applicable)
  • Backsplash installation
  • Any special features or upgrades

Contract execution: Once you approve scope and price, you sign paperwork and pay a deposit (typically 50%) to lock in selections and start the process. This commitment reserves your installation slot and initiates material ordering if needed.

Phase 2: Templating—Capturing Exact Measurements

Countertops Templating—Capturing Exact Measurements

The template is the blueprint for your countertops. Accuracy here determines how well everything fits during installation.

Preparation Before Template Appointment

Your space must be ready before the templater arrives:

Cabinet requirements:

  • All base cabinets permanently installed
  • Cabinets level and secured to walls
  • Support structures and end panels in place
  • Corner cabinets accessible and functional

Items needed on site:

  • Sinks with dimensional specifications
  • Faucets with mounting requirements
  • Cooktops with cutout templates
  • Any accessories requiring holes or cutouts

Space preparation:

  • Clear existing countertops completely
  • Create safe, uncluttered work area
  • Ensure clear access path from entry to kitchen
  • Remove items stored on or near counters

On-Site Template Appointment

A trained technician visits your home to capture precise measurements:

Initial assessment:

  • Checks cabinet level and squareness
  • Identifies wall irregularities
  • Notes any conditions affecting installation

Template creation:

  • Physical “stick” templates traced to cabinet shapes, OR
  • Laser scanning system capturing digital measurements
  • Both methods achieve sub-millimeter accuracy

Detail confirmation with you:

  • Edge profile verification
  • Overhang dimensions at each location
  • Seam placement discussion
  • Backsplash height confirmation
  • Sink and faucet positioning
  • Special cutout requirements

Sign-off: You review and sign the template drawing before the technician leaves, locking in final dimensions. Changes after this point may incur additional charges or delays.

Professional stone fabrication begins immediately after template sign-off, with your approved measurements driving all production work.

Template PreparationRequired StatusWhy It Matters
Base cabinetsPermanently installed, levelTemplate accuracy depends on final cabinet position
End panelsComplete and securedAffects edge measurements
Sinks/faucetsOn site or specs providedDetermines cutout sizes and positions
Countertop surfacesCompletely clearedTechnician needs full access
Access pathsClear and unobstructedHeavy equipment may be used

Phase 3: Slab Layout, Fabrication, and Finishing

Everything between template day and installation day happens in the fabrication shop. This phase transforms your measurements into finished countertop pieces.

Template Review and Slab Layout

Office processing:

  • Staff double-check template accuracy
  • Verify all specifications match your contract
  • Order slabs or pull from inventory based on exact square footage

Layout optimization: Programmers overlay your template on slab photos, positioning pieces for:

  • Best vein flow and pattern continuity
  • Color consistency across multiple pieces
  • Seam locations in least visible areas
  • Minimal material waste

This digital layout work ensures your finished countertops look intentional and cohesive rather than randomly assembled.

Cutting and Shaping

CNC or bridge saw cutting:

  • Template guides all cuts precisely
  • Straight runs and corners shaped to specification
  • Rough sink and cooktop openings created
  • Curves and radius corners executed

Edge profiling:

  • Your chosen edge profile shaped on CNC or router
  • Multiple polishing stages (50 grit through 3000 grit)
  • Uniform finish quality across all edges
  • Complex profiles like ogee require more time

Cutouts, Polish, and Quality Checks

Precision finishing:

  • Exact sink cutouts to manufacturer templates
  • Cooktop openings with proper clearances
  • Faucet and accessory holes positioned precisely
  • Special features (drain boards, grooves, waterfall miters)

Quality inspection:

  • Each piece checked for chips and damage
  • Polish consistency verified across surfaces
  • Dimensional accuracy confirmed against template
  • Seam edges prepared for tight joints
  • Natural stone sealed in shop (if applicable)

Scheduling Installation

Once fabrication is complete or nearly finished, the office schedules your installation window—typically 7-12 business days after templating, depending on shop workload and project complexity.

Phase 4: Site Preparation and Removal (Installation Day)

Installation day begins with creating a safe, clean environment for bringing in heavy stone slabs.

Arrival and Protection

Initial walkthrough:

  • Crew reviews layout and seam locations with you
  • Confirms everything matches expectations
  • Identifies any last-minute concerns

Site protection:

  • Drop cloths covering floors along transport paths
  • Cardboard protection on stairs and thresholds
  • Cabinet protection during removal work
  • Adjacent surface covering

Old Countertop Removal

If included in your contract:

  • Plumbing disconnected (if not done previously)
  • Existing countertops carefully removed
  • Old backsplash removed if specified
  • Materials hauled away per agreement

Cabinet and Support Check

Pre-installation verification:

  • Cabinet level rechecked after removal
  • Shims added where needed for flat plane
  • Extra supports installed at seams and overhangs
  • Bracket or corbel locations confirmed

Items verified on site:

  • Sinks ready for installation
  • Faucets and accessories available
  • Cooktops with installation hardware
  • Support brackets if required for overhangs

Phase 5: Setting, Seaming, and Sink Installation

This critical phase permanently joins your countertops to cabinets with precision work that determines long-term appearance and performance.

Dry-Fit and Adjustments

Each piece is carried in and positioned without adhesive first:

Verification checks:

  • Wall contact along back edges
  • Corner alignment and angles
  • Appliance clearances confirmed
  • Seam locations as discussed

On-site adjustments:

  • Minor scribing for out-of-square walls
  • Trimming for tight clearances
  • Vein and grain direction confirmation
  • Final layout approval before adhesive

Adhesive Application and Leveling

Setting process:

  • Beads or dabs of silicone/adhesive on cabinet tops
  • Stone carefully lowered into position
  • Level verified across entire surface
  • Shims used where needed for flat plane

Overhang verification:

  • Measurements checked against industry limits
  • Brackets or corbels installed for longer spans
  • Support adequacy confirmed before proceeding

Seam Bonding

Professional seaming:

  • Color-matched epoxy mixed on site
  • Pigments adjusted to match specific stone coloring
  • Adhesive applied to mating surfaces
  • Seam setters or vacuum clamps engage
  • Pieces pulled tight together and flush vertically
  • Excess adhesive removed before curing

Properly executed seams are tight, even, and nearly invisible—distinguishing professional work from amateur installations.

Sink and Faucet Installation

Undermount sinks:

  • Positioned using manufacturer templates
  • Clips or brackets installed for secure attachment
  • Adhesive applied for permanent bond
  • Reveal (visible edge gap) checked for consistency

Faucet and accessories:

  • Holes drilled if not completed in shop
  • Diamond core bits with water cooling
  • Holes cleaned of dust and slurry
  • Hardware ready for plumber connection

Backsplash and Caulking

Backsplash installation:

  • Stone or tile backsplash set with adhesive
  • Aligned to countertop edge
  • Joints caulked or grouted as specified

Waterproofing:

  • Perimeter joints sealed with flexible silicone
  • Sink perimeter caulked completely
  • Wall gaps sealed preventing water intrusion
  • Color-matched caulk at visible joints

Comprehensive natural stone supplier services include complete installation with proper waterproofing at all joints and penetrations.

Installation StepKey ActivitiesQuality Standard
Dry-fitPosition without adhesiveVerify fit before committing
SettingAdhesive, leveling, positioningFlat, level, properly supported
SeamingColor-matched epoxy, vacuum clampsTight, flush, nearly invisible
Sink mountClips, adhesive, alignmentSecure, waterproof, consistent reveal
CaulkingSilicone at all jointsComplete seal, color-matched

Phase 6: Sealing, Cleanup, and Final Walkthrough

Final Walkthrough

The final phase ensures protection, cleanliness, and your complete satisfaction before the crew leaves.

Sealing and Surface Finishing

Natural stone sealing:

  • Applied if not sealed in shop
  • Multiple coats as needed for stone type
  • Wiped and buffed to finish
  • Curing time communicated

Quartz:

  • No sealing required (non-porous)
  • Surface cleaned and inspected

Final inspection:

  • Chips or scratches identified and addressed
  • Seam quality verified (tight, flush, smooth)
  • Edge consistency confirmed
  • Sharp areas smoothed if needed

Jobsite Cleanup

Professional installers leave your space ready for use:

  • Dust and debris swept or vacuumed
  • Stone cutting residue removed
  • Packaging materials removed
  • Offcuts hauled away
  • Old countertops removed per contract
  • Floors wiped clean
  • Adjacent surfaces cleaned
  • Protective coverings removed last

Homeowner Walkthrough

The lead installer conducts comprehensive review:

Installation verification:

  • Seam locations and quality
  • Sink installation and alignment
  • Support brackets and corbels
  • Backsplash alignment and caulking
  • Special features (waterfalls, miters, grooves)

Care instructions:

  • Recommended cleaning products
  • Products to avoid
  • Sealing schedule for your stone type
  • Heat and scratch precautions
  • Warranty information

Sign-off: You confirm everything matches contract and template, then sign completion documentation. This represents your acceptance of the finished installation.

After the Crew Leaves

Immediate post-installation:

  • Plumbing reconnection (usually same or next day)
  • Wait for adhesive cure (24-48 hours)
  • Wait for sealer cure (24-72 hours)
  • Avoid heavy loads on countertops
  • No standing or sitting on overhangs
  • Avoid harsh cleaners until fully cured

Normal use begins:

  • Follow care instructions provided
  • Use recommended cleaning products
  • Monitor seams and caulk joints
  • Schedule resealing per stone-specific timeline

Complete Timeline Overview

Understanding the full project timeline helps you plan appropriately.

Phase 1: Planning and Estimate (1-7 days)

  • Consultation and material selection
  • Estimate preparation and review
  • Contract signing and deposit

Phase 2: Templating (1-2 days)

  • Site preparation
  • Template appointment (1-2 hours)
  • Sign-off on measurements

Phase 3: Fabrication (7-12 business days)

  • Layout optimization
  • Cutting and shaping
  • Edge profiling and polishing
  • Quality inspection and sealing

Phase 4-6: Installation (4-8 hours typical)

  • Site preparation and removal
  • Setting, seaming, sink work
  • Sealing, cleanup, walkthrough

Post-Installation (24-72 hours)

  • Adhesive and sealer curing
  • Plumbing reconnection
  • Normal use begins
Project PhaseDurationYour Role
Consultation1-2 hoursMake selections, approve estimate
Pre-template prep1-2 daysPrepare space, have items ready
Template1-2 hoursBe present, approve measurements
Fabrication7-12 daysNone required
Pre-install prepDay beforeClear paths, arrange disconnects
Installation4-8 hoursBe available for questions
Curing24-72 hoursAvoid heavy use, harsh cleaners

Key Takeaways

  • Six connected phases form the complete process from consultation and material selection through templating, fabrication, site preparation, installation, and final walkthrough—each phase building on decisions made in previous stages
  • Template accuracy drives everything downstream requiring permanently installed level cabinets, sinks and appliances on site with specifications, and your sign-off locking in final dimensions before fabrication begins
  • Fabrication takes 7-12 business days including slab layout optimization for vein flow and seam placement, CNC cutting to template specifications, multi-stage edge polishing, and quality inspection before delivery
  • Installation day follows systematic sequence of site protection, old countertop removal, cabinet verification, dry-fitting for adjustments, adhesive setting, color-matched seam bonding, sink mounting, and backsplash caulking
  • Final walkthrough confirms specification compliance including seam quality review, sink installation verification, care instruction delivery, and your signed acceptance of the completed installation
  • Post-installation curing requires 24-72 hours before plumbing reconnection, heavy use, or harsh cleaners—patience during this period ensures adhesives and sealers achieve full performance

Frequently Asked Questions

How long does the entire countertop process take?

From signed contract to completed installation typically takes 2-4 weeks. This includes scheduling (1-7 days), templating (1-2 days), fabrication (7-12 days), and installation (4-8 hours).

What needs to be ready before templating?

Cabinets must be permanently installed and level, sinks and faucets on site or specifications provided, countertop surfaces completely cleared, and access paths unobstructed.

Can I make changes after the template is signed?

Changes after template sign-off may incur additional charges or delays since fabrication begins immediately. Contact your fabricator immediately if changes are necessary.

How long does fabrication take?

Fabrication typically requires 7-12 business days depending on shop workload and project complexity. Complex designs with waterfall edges or intricate cutouts may require additional time.

What happens during installation day?

Crews protect your floors, remove old countertops if included, verify cabinet level, dry-fit new pieces, set with adhesive, bond seams with color-matched epoxy, install sinks, and complete backsplash caulking.

How are seams made nearly invisible?

Color-matched epoxy mixed on site, vacuum clamps pulling pieces tight and flush, careful excess removal before curing, and final polishing create nearly invisible joints.

When can plumbing be reconnected?

Plumbing reconnection typically occurs the next day after adhesives set. Your plumber should wait at least 24 hours before reconnecting water supply and drain lines.

What should I avoid after installation?

Avoid heavy loads, standing on overhangs, and harsh cleaners for 24-72 hours until adhesives and sealers fully cure. Follow the care instructions provided during walkthrough.

What does the final walkthrough include?

Review of seam quality, sink installation, support brackets, backsplash work, care instructions for your specific material, and signed documentation confirming your acceptance.

How do I prepare for installation day?

Clear all paths from entry to kitchen, arrange plumbing disconnection if not included, empty cabinets under sink and cooktop areas, and be available for questions during installation.

Conclusion

The complete countertop fabrication and installation process follows six connected phases, each building on previous decisions and preparation. From initial consultation defining your material and design through templating that captures exact measurements, fabrication that transforms specifications into finished pieces, and installation that permanently joins countertops to your cabinets—understanding each phase helps you participate effectively and set realistic expectations.

Your preparation directly impacts results: level cabinets and proper site readiness enable accurate templates, which enable precise fabrication, which enables seamless installation. The 2-4 week timeline from contract to completion reflects the care required at each stage to deliver countertops that fit precisely and perform beautifully for decades.Ready to start your countertop project?

Contact Granite and Marble Designs to schedule your consultation and begin the journey from initial vision to stunning finished countertops.

Understand every step of your countertop project.

Schedule your consultation today.

Contact Us